November 27, 2026 7:01 PM

printer

Indian Railways achieves breakthrough in 6.59-km tunnel in Uttarakhand

Indian Railways has achieved the main tunnel breakthrough of Tunnel-14, measuring 6.59 km, in the Rishikesh-Karnaprayag Rail Project today in Rudraprayag district of Uttarakhand. The breakthrough connects the two excavated sections of the tunnel, comprising 4.7 km from Portal-1 (Sumerpur) and 1.79 km from Portal-2 (Marora). Ministry of Railways said that to ensure the safety of nearby settlements, controlled blasting was carried out strictly during daytime hours near both portals. It added that specialised ventilation systems were also deployed throughout the 4.7 km excavation drive from Portal-1 to ensure the supply of fresh air and regulate temperature inside the tunnel.

The Ministry stated that the breakthrough marks an important milestone in the construction of the Rishikesh-Karnaprayag Rail Project, an important railway infrastructure initiative aimed at improving rail connectivity in Uttarakhand. The project is expected to provide better connectivity to the hill regions, facilitate travel for pilgrims and tourists, and support regional development by improving accessibility to important destinations in the state.